(FEP)
-
FEP報告書
FEP report.
FEP report for the safety assessment SR-Site. SKB TR-10-45.
(6 Production Reports)
-
“使用済燃料”報告書
Spent fuel report.
Spent nuclear fuel for disposal in the KBS-3 repository. SKB TR-10-13.
-
“キャニスタ製造”報告書
Canister production report.
Design, production and initial state of the canister. SKB TR-10-14.
-
“緩衝材製造”報告書
Buffer production report.
Design, production and initial state of the buffer. SKB TR-10-15.
-
“埋め戻し材製造”報告書
Backfill production report.
Design, production and initial state of the backfill and plug in deposition tunnels. SKB TR-10-16.
-
“処分場閉鎖”報告書
Closure production report.
Design, production and initial state of the closure. SKB TR-10-17.
-
“地下施設建設”報告書
Underground openings construction report.
Design, construction and initial state of the underground openings. SKB TR-10-18.
(プロセス報告書)
-
“燃料・キャニスタ”プロセス報告書
Fuel and canister process report.
Fuel and canister process report for the safety assessment SR-Site. SKB TR-10-46.
-
“緩衝材・埋め戻し材・閉鎖”プロセス報告書
Buffer, backfill and closure process report.
Buffer, backfill and closure process report for the safety assessment SR-Site. SKB TR-10-47.
-
地圏プロセス報告書
Geosphere process report.
Geosphere process report for the safety assessment SR-Site. SKB TR-10-48.
-
気候報告書
Climate report.
Climate and climate related issues for the safety assessment SR-Site. SKB TR-10-49. vol1 vol2
(安全解析関係)
-
“核種移行”報告書
Radionuclide transport report.
Radionuclide transport report for the safety assessment SR-Site. SKB TR-10-50.
-
“モデル概要”報告書
Model summary report.
Model summary report for the safety assessment SR-Site. SKB TR-10-51.
-
データ報告書
Data report.
Data report for the safety assessment SR-Site. SKB TR-10-52.
-
“将来の人間活動”報告書
FHA report.
Handling of future human actions in the safety assessment SR-Site. SKB TR-10-53.
-
“生物圏総合解析”報告書
Biosphere synthesis report.
Biosphere analyses for the safety assessment SR-Site – synthesis and summary of results. SKB TR-10-09.
〔Table 2-3には掲載されていないが、「原子力活動法に基づく申請書類リスト」の Bilaga SR-Site に含まれているもの〕
-
Site description of Forsmark (SDM-Site)
Site description of Forsmark at completion of the site investigation phase. SDM-Site Forsmark. SKB TR-08-05.
-
Repository production report.
Design and production of the KBS-3 repository. SKB TR-10-12.
-
Design premiss KBS-3V repository report.
Design premises for a KBS-3V repository based on results from the safety assessment SR-Can and some subsequent analyses. SKB TR-09-22.